skip to main content
Bidding Documents

Our Projects

Julesburg Municipal Swimming Pool & Bathhouse Facility

Julesburg, CO
Swimming Pools, Engineering

Miller & Associates partnered with the Town of Julesburg to deliver a new municipal swimming pool and bathhouse at Julesburg Town Park, providing a modern, family-friendly aquatics facility for the community. From initial planning through construction, the project was thoughtfully designed to enhance recreational opportunities while ensuring long-term durability, efficiency, and ease of operation.

Project Features

  • Four-lane, 25-yard lap pool
  • Zero-depth (beach) entry area
  • 1-meter diving board
  • Climbing wall & flume slide
  • Approximately 4,000 SF pool surface area
  • Bathhouse with men’s, women’s, & family shower facilities
  • Dedicated mechanical room for pool equipment
  • Strategic site placement within the park for accessibility & visibility
  • Provisions for future expansion, including an additional slide, spray features, & splash pad

Services We Provided

  • Project planning & stakeholder coordination
  • Site evaluation & facility layout development
  • Preliminary & final design
  • Preparation of plans, specifications, & construction documents
  • Opinion of probable construction cost
  • Funding coordination support (as applicable)
  • Construction phase services, including:
    • Preconstruction coordination
    • Shop drawing & submittal review
    • Construction observation
    • Materials testing & review coordination
    • Pay application review & recommendations
    • Final inspection & project closeout support
Julesburg Municipal Swimming Pool & Bathhouse Facility completed project

Miller & Associates worked closely with the Town of Julesburg to transform its vision for a new aquatic facility into a functional, community-centered asset. The project began with collaborative planning efforts involving Town Council and key stakeholders to evaluate site options, identify priorities, and establish a layout that aligned with the community’s recreational goals and long-term vision for Julesburg Town Park.

Following the planning phase, our team developed preliminary and final design documents, including conceptual layouts, design criteria, specifications, and an opinion of probable construction cost. The facility was designed to balance user experience, safety, and operational efficiency, incorporating features that appeal to a wide range of users while maintaining manageable long-term maintenance requirements.

The bathhouse was strategically located for accessibility and visibility within the park and designed to accommodate daily operations with dedicated shower facilities, family amenities, and a separate mechanical room for pool systems. Throughout construction, Miller & Associates served as the Town’s representative, providing construction observation, coordinating with the contractor, reviewing submittals and testing results, and assisting with pay applications and project closeout.

Completed in 2024, the new pool and bathhouse facility enhances recreational opportunities in Julesburg and provides a durable, well-designed space that supports both current needs and future expansion.