Cambridge Swimming Pool & Bathhouse Renovations
Miller & Associates partnered with the City of Cambridge to evaluate, design, and support construction of renovations to the municipal swimming pool and bathhouse at McKinley Park. The project modernized the facility to improve safety, functionality, and ADA compliance while extending its service life.
Project Features
- Renovation of existing municipal swimming pool & bathhouse
- Structural evaluation of pool tank & bathhouse
- Upgrades to mechanical and electrical systems
- Improvements to pumps, filters, & chemical treatment systems
- Recirculation piping & system enhancements
- ADA accessibility upgrades to meet current standards
- Site and deck improvements for safety and usability
- Improvements designed to extend facility service life
- Located at McKinley Park
Services We Provided
- Facility evaluation & condition assessment
- Coordination with City staff & stakeholders
- ADA compliance review & recommendations
- Alternatives analysis & cost evaluation
- Preparation of technical report & improvement options
- Project planning & implementation strategy
- Preliminary & final design
- Preparation of plans, specifications, & construction documents
- Construction phase services, including:
- Preconstruction coordination
- Shop drawing & submittal review
- Construction observation
- Materials testing coordination & review
- Pay application review & recommendations
- Final inspection & project closeout support
Miller & Associates worked with the City of Cambridge to evaluate and revitalize its existing municipal swimming pool facility, with the goal of improving performance, addressing deficiencies, and extending the life of the asset. The project began with coordination with City staff and a comprehensive on-site assessment of the pool, bathhouse, and supporting infrastructure.
The evaluation included detailed review of structural components, mechanical and electrical systems, circulation and treatment equipment, and overall site conditions. An ADA accessibility assessment was also conducted to identify areas requiring upgrades to meet current standards. Based on these findings, our team prepared a report outlining deficiencies, probable construction costs, and a range of improvement alternatives—from targeted repairs to more comprehensive upgrades.
Working closely with the City, a preferred improvement strategy was selected that balanced cost, functionality, and long-term value. Miller & Associates then developed final design documents and coordinated a construction schedule that aligned with funding considerations and seasonal pool operations.
During construction, our team provided full construction engineering services, including coordination with the contractor, review of submittals and testing, and on-site observation to ensure the project was completed in accordance with design intent. Reopened in 2022, the renovated facility provides a safer, more efficient, and ADA-compliant aquatic environment for the Cambridge community.